Location: Home
Consulting
Capability
Decommissioning
ode has an extensive range of expertise and experience gained during the successful participation in decommissioning projects, these have encompassed the whole range of dis-investment related activities from 'due diligence' review of provision made for the end of field life costs, through the detailed preparations prior to removal from the offshore location, to complete de-manning and remote operation of platforms, and on to preparation for re-use or de-construction and re-cycling of the waste streams. This depth of experience has been applied to both onshore and offshore facilities and particularly relates to the following areas:
- Legislative requirements
- Permit and Consents
- Facility shut down prior to decommissioning
- Decontamination and preparation for decommissioning
- Redeployment and re-use of facilities and equipment
- Offshore marine operations
- Deconstruction methods
- Recycling of materials
- Handling and disposal of hazard waste
With the complex legal framework and the high profile of decommissioning operations in the oil and gas sector ode can add value to Clients projects by the comprehensive planning of the process and the meticulous preparation of the requisite documentation engineering and planning. The range of services available is extensive and comprises comprehensive technical and commercial expertise for the decommissioning of offshore and onshore facilities, including :
- Project Management
- Planning and cost estimation
- Formal identification of BPEO
- Drafting of Abandonment Programmes
- Writing Decommissioning Safety Cases
- Environmental Accounting
- Planning, engineering, and supervision of decommissioning marine operations
- Workpack preparation
- Construction/Deconstruction supervision
Recent decommissioning and re-use work carried out by our team have included the following projects:
Client |
Scope |
| Shell | Inde Field decommissioning study |
| Talisman | Development of cost estimating model |
| BP | Benchmarking decommissioning cost estimating model |
| ConocoPhillips | Maureen Platform decommissioning and refloat. Bacton terminal decommissioning assessment |
| ExxonMobil | Camelot decommissioning and removal |
| RWE Dea | Camelot platform re-use. |
| BP | Decommissioning studies for Egyptian GoS assets |